Building a Brand Story at Architectural Scale

A large-format history timeline that had to be technically redesigned two days before installation without losing the original creative intent.

RoleSenior Graphic Account Manager / Technical & Creative Lead
VenueLas Vegas Convention Center
ScopeEnvironmental graphics
Production10 rolls of cling material
SHRM23 Timeline Wall
Largestwall cling applied at LVCC
10 rollsof material
2 daysto redesign the production approach

The Challenge

Two days before install, the original production method disappeared.

The wall had been designed as cut graphic elements applied directly to a white wall. A facility-approved material change meant the new material could be printed but could not be plotter cut.

The concept, files and installation plan were already built around cut components.

The Solution

Use the material limitation as part of the design.

My technical production knowledge led to a solution: add a very light blue tint behind the full composition so the approved cling could be printed as panels while still reading intentionally against the architecture.

I pitched the revised approach directly to the client's VP of Events, secured approval and moved the files into the new production method.

The Result

Production knowledge protected the creative idea. The workaround became invisible in the final environment, and the finished installation became the largest cling ever applied to a wall at the Las Vegas Convention Center.